4 classic ways to solve the problem of internal leakage Greasing and drying containers

This technique involves sealing the inner surface of the emerging concrete component. Water dominates the inner surface of concrete elements, but water is still in the cavity. The first simple attempt is to use a high viscosity elastomer compound to attach it to the gaps/joints that are created. This paste usually requires scratches/grooves to grow at least 1 1/8 the thickness of the dough, which can also be reinforced with cotton or fabric. In some cases, the inability to move the crack can solve the long-term leak under a concrete floor problem. In most cases, however, these solutions will only provide short-lived performance. 

A stronger solution is to grind or grind the cracks to a specific shape and then fill them with a high viscosity, low elasticity filler. The performance of this solution depends on the depth and width of the cracks and the use of cutters and glue on the concrete walls. Typical slot gaps for 3 / 8×3 / 8. The use of fillers ranges from elastomer seals (low modulus) to highly modulated epoxy resin. 

Similar to high molecular weight composites used in sawing or excavating concrete cracks, the gaps are filled with Portland cement-based composite/mortar. The most common method of a chemical reaction is to use some sort to breed Portland Christians. Because large resilient epoxy fillers are used, the cracks should be relatively stable. Glass mortar for cracking in dry concrete Get More Information.

Common chemical cracking by injection

If this technique is successful, there is a good chance of burying the cavity in the concrete evacuation section. Water and air are controlled via a powerful interface with free interaction with steel. If you find leak under concrete floor, There are 3 basic methods (cracks/joints and interfaces) for dealing with it.That’s how it’s done:

Background (curtains); This stores the bird material behind cracks in the walls/floors/nodes as filling in the soil layer (an extensive measure of soil compaction). Cement-based materials compress the soil to prevent water leaks. This can be done by wall drilling or by drilling directly on the wall.

Internal injection (prevents cement death); The bird material accumulates in the inner concrete crack/knot. The injected compound buries any cracks/buttons from the depth of the inner center to the outer surface.

Surface mount injection; In addition to the blocking cement mortar, the surface of the leak under a concrete floor is covered with cementitious material. Alternatively, you can touch the waterproof material and partially package it before applying the outside pressure.

All of these injection techniques involve the use of reactive or inactive solutions to react polymer resins and/or reactive/inactive gels either inside or behind the crack or composite area. Most chemical measures in cracks/joints involve the low setting of the reactive polymer based on epoxy, polyurethane, or acrylic.

In theory, this reactive polymer fills the damaged/bonded area to avoid holes. The viscosity of the cranberries as well as the width of the crack/cut need to be carefully weighed. It can also be placed on the sidewall of the crack/joint at different angles depending on the cleanliness of the crack/joint. These different reactive polymers show different growth rates. Other considerations include width, movement, direction, age, and order of adjacent slots/nodes.

Relocation conditions and access to occupational health and safety The coverage costs vary greatly depending on the length of the shift and the materials used.

Mortar paint, mastic, reagents

In this process, a sticky layer or a chemically reactive mortar material (crystal growth) is applied to the inner surface of the concrete, from which water escapes (negative surface treatment). All coatings and reagents are required before installation to ensure the media is dehydrated. Therefore, chemical grout or wire, hemp, and/or dry coating can be glued together before using reactive paint and grout to reduce active water runoff.

Inner layers generally belong to the common family of polymers (i.e. epoxy, polyurethane, acrylic, and/or latex) used for pressure injection. Interior wall paint must be resistant to the influence of negative pressure and moisture pressure. This layer can be respiratory (water vapor permeability) or permeable (vapor inhibitor).

The inner coating depends on whether the adhesion to the concrete substrate exceeds the pressure of the liquid and/or moisture. In addition, they have to be flexible in order to react to substrate movements. So if you are facing a water leak under a concrete floor then you should Hire a Slab Leak Repair Expert to solve the problem for you.

Electric Penetration Pulse Technology (EOP)

This technology is an electrical concrete drying solution to protect steel bars from concrete. The EOP system basically has a power source and two charging electrodes. The power supply charges the positive (+) terminal on one end of the positive element and the negative (-) terminal on the other end. Low voltage water (24-28 volts) coming from the power supply on either side of the clamps is caused by the passage of concrete elements. Current flows from cathode to anode and electrons from anode to cathode. The EOP facility is designed to create low-density terrain on wet concrete and adjacent earth elements.

In this construction, frost protection electrodes are generally placed on both sides of a concrete element or a damp area. Concrete elements and the surrounding soil are slightly conductive (wet)

Space is filled with water and ions move from the tip of the electrode to the end of the electrode, where an electric field is created in the wet concrete between the ends of the electrodes. Over time, water flows from the anode to the cathode and dries the concrete.

Wet concrete works more than dry concrete, so concrete with high internal humidity produces more than dry concrete. Low-strength concrete generally increases conductivity. As the specific microstructure approaches satisfaction, the managerial position is reduced. Get More Information.

The design of the EOP system depends on many factors. Anode grid systems or concrete elements are located in damp locations (in or near cracks and joints). It should therefore be noted that the electrical field of the cathode in the concrete section is relatively uniform. As an electrical solution, the designer must ensure that the external field does not interfere with the low voltage EOP system or other conditions. 